SSI SCHAEFER prepared a concept for the construction of a new eleven-aisle high bay warehouse for the international dairy company Campina.
The system enables the continuous transport from the production lines with efficient storage and simultaneous positioning for sequenced shipping.
The result is a successful combination of different logistics systems and is based on the expertise and excellent competence of the planning team.